bryan hickling

Just a short update on Bryan Hickling who was last weeks speaker. He gave us an enthusiastic run down on the design, structural engineering and complex planning that went into creating the new motorway system which has just been completed around the outside of Christchurch.

 

It was interesting to note that that the work was completed two months ahead of schedule and that it has already alleviated much of the traffic rush hour problems.

For example Shona Dodd noted that it had reduced her travel time from approximately

1 hour to 30 minutes which is a considerable time saving in her travel.